Status Update
Another day of decent progress today, covering 18km across partly crevassed areas without any problems.
We are now camped at the bottom of the next technical section (see pic) which will require us to ferry loads for 7km. It will probably take five loads with both Cats taking each load. Round trip will be about 3hrs, so it won’t be a fast process.
Tomorrow we have another day’s work on one of the Cats to change some seals.
Current position: S72 10′ 23.4″ E023 28′ 32.5″
Altitude: 1743m
Brian Newham, Ice Team Leader